Fast-track Development of a New Pump-Turbine Energy Recovery Unit with Stringent Efficiency Requirements - Case Study

FEDCO had less than four weeks to develop a highly optimized fluid design before committing to final pattern and casting designs. The main challenge was that FEDCO had just one chance to get the hydraulic and casting design right, so every resource was devoted to that objective.