Accelerated Life Testing Test Plan Development

A power generation company had experienced sporadic field failures of gas flow-rate valves in their turbines. Upon reporting on the valves’ failures, they also discovered that their supplier had marked the current model for obsolescence, so a new flow-rate valve would need to be implemented. The power generator enlisted Ansys to determine a thorough and accurate method for validating the reliability and robustness of a new flow-rate valve as quickly as possible.