Introducing a Digital Engineering Methodology To Aid All Engineers

May 06, 2025

READ ALOUD

PAUSE READ

Bernard Dion | Ansys Fellow, Ansys
Caty Fairclough | Corporate Communications Manager, Ansys
methodology-blog-hero

A systems engineer developing a novel system-on-a-chip (SoC) design. A CFD engineer studying the airflow over the wing of a new electric airplane design. A safety engineer reviewing the design of a new pacemaker to confirm that it is compliant with existing regulations and requirements. What do all these people have in common?

system-on-a-chip

A system on a chip

One connecting thread is the ever-present need to efficiently collaborate, produce accurate and compliant results, and remain agile. Historically, these goals have been hard to achieve — especially in our increasingly multidisciplinary and virtually connected world.

However, there is a new tool that can aid in addressing this challenge: a digital engineering methodology from Ansys that promises to change how you innovate, collaborate, and design the products revolutionizing the world. This methodology will help engineers from all industries and disciplines and will work for projects of all sizes to unlock the full benefits of digital engineering.

In short, this digital engineering methodology is a set of processes that engineers can use to run a systems engineering project. What makes this digital engineering methodology stand out is that it provides guidance via processes throughout the entire project — from helping to set up and manage a project to applying digital engineering best practices, analyzing systems, and linking with simulation software as well as safety and compliance guidelines. This digital engineering methodology will provide engineers with a comprehensive environment to build their system within while solving some of the common hardships they face today.

The Challenges Modern Engineers Face

The rapid pace of technological innovation holds true no matter what industry you’re in, with a seemingly constant stream of new breakthroughs and technologies.

Creating such advanced technologies often requires coordinating between large, multidisciplinary teams that are spread across the globe. These teams have the diverse backgrounds and expertise needed to excel, but at the same time, their strengths and knowledge may exist in silos. Teams may not follow the same processes, know what information other teams need, have an accurate overview of the whole project, or even use the same terminology.

This can make collaboration tricky and ineffective, with multiple teams often recreating models and simulations to fit their own needs instead of reusing existing resources.

example-of-a-work-breakdown-structure-for-an-evtol

Example of a work breakdown structure for an electric vertical take-off and landing craft

modern-engineering-teams-multidisciplinary

Modern engineering teams are increasingly distributed and multidisciplinary.

Compounding this issue is the need to move quickly and be agile in a competitive environment, all while striving for optimized designs that are safe and compliant. Making matters more challenging is the fact that these requirements are often in conflict with one another. For example, creating complicated designs quickly can lead to more issues, which requires more time to validate that they are safe and compliant. Another case is if different parts of a system are being handled by separate teams, each trying to reduce costs as much as possible. Although their work may function separately, the teams may discover that the overall system design is nonfunctional when put together at the end of the project, which would be a giant time and financial setback.

To avoid issues like these, Ansys has developed a new methodology.

methodology-for-helping-to-realize-digital-engineering

Methodology for helping to realize digital engineering

What Is a Digital Engineering Methodology?

One way to view Ansys’ new digital engineering methodology is as a multidisciplinary cookbook, full of standardized and repeatable “recipes” that enhance efficiency, collaboration, accuracy, and more.

Let’s start by discussing the importance of this being a digital engineering methodology, which is much wider than a model-based systems engineering (MBSE) methodology. With a digital engineering methodology, all elements across disciplines and throughout design, simulation, analysis, and validation are brought together into one digital engineering methodology (i.e., our “cookbook”) that serves as an authoritative source of truth. The digital engineering methodology covers:

  • Standardizing and sharing the system requirement definitions and system architecture definition
  • Designing the construction of the system
  • Optimizing the system design
  • Integrating system components
  • Validating the system
  • Ensuring system compliance

Having all these processes and requirements within one cohesive digital engineering methodology increases efficiency by ensuring that all subject matter experts can work within one space and make informed decisions based on all available information.

Say you have 100 people working on an expansive vehicle systems engineering project. To avoid errors and setbacks, everyone can use the digital engineering methodology to express their designs in the same way, increasing efficiency across the board. Further, they can do this while doing exactly the amount of modeling they need, without creating extra models just for one element of the design and development process.

Whenever needed, the methodology can also collect all this information and automatically produce a document with a description of everything available. This saves time because the document is developed instead of written. Even better, the information in the document is extremely precise, as it is generated directly from the model being worked on.

We’ll go into more depth into other advantages of the digital engineering methodology below.

Fostering Collaboration

In addition to working all in one space, the digital engineering methodology also ensures that everyone can better communicate in an organized fashion to reach their goals.

One way it does this is via a standardized set of “recipes” that engineers of all disciplines can refer to. These include a set roadmap for the digital engineering project, a template library, and work instructions for those templates. Of these, the roadmap gives context and guidance on how to run a project, including the first step when running a project, which is creating a system architecture.

All the elements within the digital engineering methodology are made to be adapted to whatever the individual user intends to achieve. For instance, engineers can copy the templates in the pre-assembled template library into their project. They can then customize them according to the included work instructions to fit their own uses. With templates, two engineers from different fields can better understand one another’s work.

A few examples of the templates included in the digital engineering methodology are:

  • A management template describing how to organize the project via a work breakdown structure. This corresponds to packages (i.e., individual tasks with inputs and outputs) within the system model.
  • A template for defining a glossary of common terms used in that project. These definitions form a common language and understanding between everyone working on the project.

The digital engineering methodology aims to have templates for every step of the project, with many already developed and more on the way.

Ensuring Compliance, Standardization, and Accuracy

Being compliant throughout all steps of your project is important for all engineering disciplines. With this in mind, we intentionally designed the digital engineering methodology based on existing standards and processes, such as ISO/IEC/IEEE 15288:2015 and the U.S. Department of Defense (DoD) standards in digital engineering. The digital engineering methodology is also aligned with industry-specific standards to create a useful general resource across disciplines. Ingraining these standards and processes into the digital engineering methodology ensures that best practices and standards are in the same place for all team members to use when creating the best design possible.

Of course, you cannot ensure compliance and standardization without accurate results. That’s why this digital engineering methodology also integrates with all Ansys products to provide accurate, comprehensive analyses, no matter your field.

Remaining Agile

Agile development isn’t just for software development anymore. Today, engineers are approaching system engineering from an agile perspective, too. As such, our digital engineering methodology was created with a focus on remaining agile. This means that while engineers follow the existing organization while working, in parallel, the methodology can be modified and improved upon to include new elements, such as a committee approval template. This template becomes available to everyone as soon as it is completed, which maintains an easy-to-follow yet agile workflow for everyone.

model-pattern-to-identify-stakeholders-and-their-needs

Model pattern to identify stakeholders and their needs

What’s the Next Course?

The digital engineering methodology may very well be a necessary tool for the future of digital engineering. To successfully maintain a project from inception to deployment by bringing all the pieces together, this digital engineering methodology will be an essential tool in any engineer’s belt.

Learn more about this new digital engineering methodology.


Just for you. We have some additional resources you may enjoy.

TAKE A LOOK


Recommendations

Harness Simulation To Connect to Industry 5.0

Harness Simulation To Connect to Industry 5.0

In alignment with Industry 5.0, simulation-powered digital engineering promotes an approach that bridges technological advancements with industrial needs.

Ease Into Industrial Digitalization With Simulation

Ease Into Industrial Digitalization With Simulation

Learn how simulation helps digital transformation challenges in industry by bridging skill gaps, enhancing data management, and streamlining system integration.

Top Executives Share Their Views on the Future of Digital Engineering in the Age of AI

Top Executives Share Their Views on the Future of Digital Engineering in the Age of AI

Get key takeaways from executives on the future of digital engineering in the age of AI from an Ansys, part of Synopsys, roundtable at Simulation World Detroit.

The Advantage Blog

The Ansys Advantage blog, featuring contributions from Ansys and other technology experts, keeps you updated on how Ansys simulation is powering innovation that drives human advancement.