Computer Simulation Helps Optimize Boiler Efficiency While Reducing Prototype Cost

The challenge was to develop a new three-pass, oil-fired, horizontal-flue water boiler and: • Increase heat transfer efficiency and reduce combustion gas pressure drop • Reduce six month lead time to build and test prototypes • Avoid prototyping ill-fated designs • Gain competitive advantage by speeding time-to-market, lowering design and production costs, and building superior products that are both unique and reliable

View Now (PDF)